By using this site, you agree to the Privacy Policy and Terms & Conditions.
Accept
routeonerouteonerouteone
  • News
    • Show all
    • Awards & Events
    • Deliveries
    • Environment
    • Exhibitor News
    • Euro Bus Expo
    • Features
    • Legal
    • Minibus and minicoach
    • Operators
    • Opinion
    • People
    • Suppliers
    • Vehicles
  • Vehicles
    • Find a Vehicle
    • ZEV Comparison Tool
    • Sell a Vehicle
    • Vehicle Seller Dashboard
  • Insights
  • Careers
  • Events
    • British Tourism & Travel Show
    • Euro Bus Expo
    • Innovation Challenge
    • routeone Awards
  • Advertise
  • Contact
    • Share your news
    • Subscribe
    • Update Subscription Details
  • Latest Issue
  • SIGN UP
Reading: First Bus pushes forward with static battery power storage in depots
Share
Font ResizerAa
Font ResizerAa
routeonerouteone
  • News
    • Show all
    • Awards & Events
    • Deliveries
    • Environment
    • Exhibitor News
    • Euro Bus Expo
    • Features
    • Legal
    • Minibus and minicoach
    • Operators
    • Opinion
    • People
    • Suppliers
    • Vehicles
  • Vehicles
    • Find a Vehicle
    • ZEV Comparison Tool
    • Sell a Vehicle
    • Vehicle Seller Dashboard
  • Insights
  • Careers
  • Events
    • British Tourism & Travel Show
    • Euro Bus Expo
    • Innovation Challenge
    • routeone Awards
  • Advertise
  • Contact
    • Share your news
    • Subscribe
    • Update Subscription Details
  • Latest Issue
  • SIGN UP
© 2026 routeone News | Powered by Diversified Business Communications UK Ltd
- Advertisement -
routeone > News > First Bus pushes forward with static battery power storage in depots
News

First Bus pushes forward with static battery power storage in depots

One MWh facility in Hoeford soon to go live and work on larger installation in Aberdeen to start

routeone Team
Published: 28 August 2025
Share
First Bus pushes on with stationary battery power storage at depots
SHARE

First Bus will begin using its largest static battery energy storage facility at Hoeford depot in Hampshire during September. It is part of a project that the group says will ultimately see traction batteries at the end of their first lives taken from its buses and moved to such installations.

In what is described as a major step in First Bus plans to develop those battery storage sites, the Hoeford facility will have enough space for “almost three bus batteries” with potential to hold a megawatt hour of power – enough to supply what the operator says is 125 homes for one day.

Battery storage at First Bus depots will support the UK’s electricity network by redistributing power at peak times. Stored power will also be used to charge some of the operator’s fleet of battery-electric buses.

In addition to Hoeford, work will start on a similar but larger facility in Aberdeen by the end of 2025. First Bus will also explore opportunities to create more across the UK over time.

Use of former traction batteries from electric members of the First Bus fleet for stationary power storage will give them a new lease of life and progress the operator’s decarbonisation strategy. That includes a net-zero commercial bus fleet by 2035, work that has already seen 1,200 electric buses enter service.

At the same time that First Bus advances static battery energy storage, sister company FirstGroup Energy has taken lead investor position in Palmer Energy Technology.

It designs and manufactures battery energy storage systems and was founded by automotive heavyweight Dr Andy Palmer, who for a period was Vice-Chair and CEO of bus manufacturer Switch Mobility. Other investors are Barclays and Oxford University.

First Bus pushes on with stationary battery power storage at depots
FirstGroup Energy is lead investor in Palmer Energy Technology, founded by automotive leader Dr Andy Palmer

Dr Palmer has welcomed the investment from FirstGroup Energy and other parties. “This will allow us to accelerate our business and give the UK a leading position in battery energy storage system technology,” he says.

FirstGroup Investment Director – Energy Faizan Muhammad notes how the investment in Palmer Energy Technology “continues our strategy of backing new and innovative companies aimed at supporting our long-term public commitment of achieving a zero-emission commercial bus fleet by 2035.”

A previous investment by FirstGroup Energy in September 2024 saw it take a £1 million stake in battery-electric repower specialist KleanDrive. Drivelines from that supplier are to be fitted to 30 mid-life Wrightbus StreetDeck diesel double-deckers in the First Bus fleet.

TAGGED:Aberdeenbattery storagefirst busHoefordPalmer Energy Technology
Share This Article
Facebook LinkedIn Threads Email Copy Link
Previous Article Van Hool Astromega TDX27 for Richmonds Coaches Richmonds Coaches welcomes a Van Hool TDX27 Astromega
Next Article Free weekend bus travel in Portsmouth for September Free weekend bus travel in Portsmouth for September
- Advertisement -

Latest News

Metro yellow electric buses in Liverpool City Region set for service
Metro yellow electric buses in Liverpool City Region set for service
News
Centrad 360 brings all-round vehicle view for coach and bus drivers
Centrad 360 brings all-round vehicle view for coach and bus drivers
Suppliers
Don't Travel Empty relaunches under Adrian Smith's leadership
Don’t Travel Empty relaunches under Adrian Smith’s leadership
Suppliers
Alford bus collection readies for annual open day on 5 July
Alford bus collection readies for annual open day on 5 July
News
- Advertisement -

routeone magazine is the indispensable resource for professional UK coach, bus and minibus operators. The home of vehicle sales and the latest bus and coach job vacancies, routeone connects professional PCV operators with complete and unrivalled news coverage.

  • Terms & Conditions
  • Privacy Policy
  • GDPR Policy
  • Sustainability
  • Advertise
  • Latest Issue
  • Share Your News
routeonerouteone
Follow US
© 2026 routeone News | Powered by Diversified Business Communications UK Ltd